MarLinx Network Solutions · Reference guide

MultiSite™ reference architectures

Two design baselines with one deployment discipline: documented design, controlled installation and evidence-based acceptance.

Decision areaEnterprise StandardValue Standard
Best fitSites with more demanding security, resilience and centralized operations requirements.Branch environments with straightforward requirements and a cost-conscious lifecycle plan.
Reference topologyPrimary and backup WAN → managed security edge → managed PoE switching → business, guest and device networks.Primary WAN → managed gateway → managed PoE switching → business, guest and device networks; backup WAN scoped to continuity needs.
SegmentationDocumented VLANs, access policies and management boundaries; site-to-site access as required.Documented business, guest and device separation with approved access rules.
ResilienceDual-connectivity design and tested failover; redundant equipment where the site requirement justifies it.Defined recovery procedure; backup connectivity and spare equipment options scoped per site.
Management & supportCentral configuration policy, monitoring ownership, support escalation and renewal tracking.Central visibility, configuration backups, named support ownership and lifecycle tracking.
Technology optionsCisco/Meraki or Fortinet-based designs, selected against the approved operational requirements.UniFi-based designs where requirements fit; scoped Fortinet or Cisco/Meraki alternatives when security or support requirements warrant them.
Commercial scopeItemized equipment, subscriptions, support, deployment and ongoing operations.Itemized equipment, applicable subscriptions, deployment and selected support options.
Final equipment models, capacity, licensing, support and failover behavior are validated during engineering. Manufacturer options are not interchangeable or a statement of certification.

Repeatable per-site scope

Specify the bill of materials, labor, site-readiness assumptions, travel, validation and closeout. Identify and approve construction, additional cabling, carrier charges, after-hours work and unforeseen remediation separately when applicable.